Second Skillset
Try lesson 1

Harnesses · Lesson 1 · Premium

Build an AI routine for month-end variance commentary

Build a routine that has AI draft the monthly management pack's budget-vs-actual commentary: what starts it, the instructions it reads every run, the tools and checks code runs around it, what it can reach and remember, who signs off and what it logs. Test it on last month before switching it on, change what the test shows, test it again and sign it off.

What you'll practice

Design, test and sign off an AI harness: put each control where it can be done reliably, and prove the whole routine on a known month before it runs on its own.

What gets checked

  • A trigger and an instruction file the routine can run on with nobody asking
  • Each control where it belongs: an instruction, a tool, a check or the reviewer
  • Least access, a person at sign-off, and a log of what it ran on
  • A test on a month whose answer you know, every line compared
  • Changes made to the harness, not the model, and tested again
  • Your sign-off says what runs on its own, what was tested and what only a person can do

About this lesson

Part of module 5, Harnesses

The 6 steps

  1. Trigger and instruction file
  2. Tools and checks: where each control lives
  3. Permissions, memory, approval and log
  4. Test it against the known answer
  5. Change the harness and test again
  6. Sign off the harness

The source files

Reporting policy
Half a page on what the management pack shows, which lines are explained, and who signs it off.
Close calendar
Last month's close, business day by business day: what was planned, and what happened.
Trial balance
Last month's final trial balance.
Budget
Last month's board-approved budget, line by line.
Ledger detail
The ledger lines behind the accounts the commentary turns on, with when each one posted.
Close notes
Short notes from the close team on what happened in the month.
Signed-off commentary
Last month's commentary as it went to the finance director, written by hand: the known answer.

What the AI gets wrong

A routine's checks catch what they were built to catch, and its test run can look clean. A line can pass every check and still be wrong, and only a month whose answer you already know shows it.

Questions

What's a harness?

Everything around an AI that makes it do one job safely every time: what starts it, the instructions it reads first, the tools it can call, what it can reach, the checks code runs around it, what it remembers, where a person approves and what it logs. AI tools call these parts by different names, such as schedules, custom instructions, actions, permissions, guardrails, memory, human review and run history. The lesson uses neutral names so the skill carries to any of them.

Is this the same as saving a prompt?

No. A saved prompt is one part of a routine: its instructions. This lesson builds the rest around it, and the point is that instructions only ask. Code does the sums and checks every draft, and a person signs off.

Do I need to know how to code?

No. You decide what each part of the routine does and where each check lives; the lesson's tools and checks are already built. Knowing what code can and can't check is the skill.

Is the test run real?

Its runs are written in advance, so everyone meets the same situation and every grade can be checked. Every figure in them is worked out from the lesson's own files.

How long does it take?

About 17 minutes, in 6 short steps. Each step is graded as you go.

Is it free?

No. It's part of the paid plan, which opens soon. Lesson 1 is free with no signup, and lesson 2 is free with an account.

Which AI tool does it use?

Its own neutral assistant, built into the lesson, so you don't need an account with any AI company. The checks you practice carry over to ChatGPT, Copilot, Claude or whatever your firm uses.

Do I need my own data?

No. The source files come with the lesson, so there's nothing to prepare and nothing of yours goes in.

How is my work graded?

The way a reviewer would grade it: correct, incomplete or a serious error. A serious error is work that reads well but rests on a wrong figure or a claim the files don't support. Every figure is checked by code against the lesson's files. Your written note at the end is checked by code first, then by an AI grader against a written rubric.

What if I get a step wrong?

You get a hint that says which check failed, not the answer. After two wrong tries you can choose to see the answer, but that step then scores 0 of the lesson's 100 points.

Guides for this lesson